Working with an Architect
We collaborated with an architect on the renovation of our home. We set a fee based on an estimated renovation cost of approximately $350,000. We also paid about $10,000 for all the necessary permits (from the city, water utility, school district, etc.).
The architect then solicited bids from contractors. The bids came in at $825,000 and $650,000—well over our budget.
The project has since been redesigned and scaled back, and we have found a contractor who works in the area. However, we now have to pay for the permits all over again. The architect failed to keep track of timelines and designed a project that far exceeded our budget.
Is this a common situation? We began this process 3.5 years ago.
The architect then solicited bids from contractors. The bids came in at $825,000 and $650,000—well over our budget.
The project has since been redesigned and scaled back, and we have found a contractor who works in the area. However, we now have to pay for the permits all over again. The architect failed to keep track of timelines and designed a project that far exceeded our budget.
Is this a common situation? We began this process 3.5 years ago.
Posts: 76
Re: Working with an Architect
I believe one of the biggest issues here was the lack of budget control from the very beginning.
An architect should have a realistic understanding of local construction costs and should speak up when a proposed design is likely to exceed the client’s financial means.
Obtaining preliminary estimates from contractors during the design phase could have helped avoid such a significant gap between expectations and the actual bids.
An architect should have a realistic understanding of local construction costs and should speak up when a proposed design is likely to exceed the client’s financial means.
Obtaining preliminary estimates from contractors during the design phase could have helped avoid such a significant gap between expectations and the actual bids.
Posts: 63
Re: Working with an Architect
Many designs are created without considering the increasing cost of materials and lack of labour. Using a professional to help you at an early stage will help determine when to consider a constructability review is needed. Using experienced builders to look at your plans will ensure your design is achievable and can be created at current market prices.
Posts: 78